The Rodney Power Station is a proposal for a natural gas fired combined cycle power station developed by Genesis Energy Limited. The power station, if built, would be located on a 48 ha site midway between Helensville and Kaukapakapa on State Highway 16, near the Kaipara Harbour, north west of Auckland. The proposed development includes substantial upgrade or replacement of the Helensville waste water treatment plant, which the local council would otherwise have to fund. The plant is designed to use high efficiency combined cycle gas turbine technology to meet the increasing demand for electricity in the north Auckland region. The location will also assist to ease constraints on HV electricity transmission.〔 In its assessment of Transpower's proposal to upgrade HV transmission to north of Auckland, the Electricity Commission considered that the Rodney power station project provided a generation alternative to transmission. == Consenting == Genesis Energy's applications for resource consents including air discharges were notified for public submissions in April 2008, a public hearing was held in September and the resource consents were granted by Auckland Regional Council in December 2008. The project was opposed by some local residents,〔(【引用サイトリンク】title= Stop Rodney Power Station )〕 Greenpeace and the Green Party. Land use resource consents for the power station were granted by Rodney District Council in March 2009. A variation to the District Plan created a thermal energy generation rural zone between Helensville and Kaukapakapa. Although resource consents and the District Plan provisions are in place, Genesis does not intend to proceed with construction in the near future. The resource consents allow Genesis a period of 15 years in which to build the plant.〔 The site for the power station is currently for sale, placing the future of this project in doubt. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Rodney Power Station」の詳細全文を読む スポンサード リンク
|